Industry solutions
Anhui Power Transmission and Transformation Engineering Company
Anhui Power Transmission and Transformation Engineering Company
Project unit: Anhui Power Transmission and Transformation Engineering Company
The distance between the transmission line and the ground is high, the line span is long, and the situation under the line is complicated. Once the foreign matter is entangled on the line, the foreign matter needs to be removed after power failure.
The "laser foreign body removal instrument" can be carried out when the transmission line is live, without line load transfer, effectively reducing the risk of the power grid;
There is no need to climb the heights, and it can be completed only on the ground, reducing the risk of removing floating objects from medium and low risks to acceptable risks;
No need to touch the equipment, no damage to the equipment, effectively reducing equipment risks; short operating time, average operating time <30 minutes, convenient, fast and efficient.
Products
Product Consultation
Leasing Service
E-mail: jsfuzhong@163.com
Company Address: Building 16, CECEP Environmental Protection Technology Park, No. 33 Gaojia Road, Wujin District, Changzhou City
Copyright © 2024 FORTU INTELLGENCE TECHNOLOGY CO.,LTD. 苏ICP备19033914号-1
Search
Hot keywords: crawler spider type aerial work platform, crawler only mini crane,